Demonstration Project

Creosote Valley 2045

Area Plan

Growth • Biodiversity • Connectivity

Planning for a growing community while protecting the systems that connect people, places and habitat.

Draft Plan Review · Public review open through November 15
LocationNevada
Project typeArea Plan
Planning horizon2045
Current phaseDraft Plan Review
Public reviewOct 1 – Nov 15
PopulationRoughly 268,400

Demonstration project · demonstration data

Creosote Valley 2045 is an illustrative planning project created to demonstrate Tortoise 40. Places, findings, public input, and project data shown here are fictional or demonstration content unless otherwise identified.

References to planning workflows, public agencies, or government processes do not imply endorsement by any particular public agency. Trust + Transparency

Pass it on

Share the project with someone who should see it.

Stay with it

Follow the project for what comes next.

Take it away

The whole project, as a document you can send on.

PDF · Full report · Updated Sep 28, 2026

Project schedule

Where Creosote Valley 2045 is in the process.

  1. 01Existing ConditionsComplete
  2. 02Community VisioningComplete
  3. 03Alternatives DevelopmentComplete
  4. 04Draft Plan ReviewCurrent
  5. 05Final PlanUpcoming
  6. 06AdoptionUpcoming

The project is in phase 04, Draft Plan Review. Six phases from existing conditions to adoption. Dates are indicative and would be confirmed by the lead agency.

01

Overview

Why this plan matters

How should the valley grow, and what should stay open?

Draft Plan ReviewReview closes Nov 15

268,400

Residents

101,200

Households

32,000

Planning area acres

34%

Projected growth by 2045

Creosote Valley is growing. Over the next two decades, new neighborhoods, roads, parks, trails, community facilities and employment areas will shape how people experience the valley.

At the same time, Creosote Valley contains important desert habitat, wildlife movement areas, washes, open space and natural landscapes.

The Creosote Valley 2045 Area Plan explores how these systems can work together. It will guide future growth while protecting important natural areas, improving ecological and human connectivity, expanding access to parks and trails, and creating a more connected and resilient community.

02

Framework

Creosote Valley · Planning Area

Existing Conditions

Existing Conditions2045 GROWTH BOUNDARY
N
FrameworkGrowth BoundaryCommunity & parcelGrowth pressure
Natural SystemsHabitatHabitat interior & coreWildlife Connectivity CorridorMovement Route
ConnectivityPrimary RoadLocal StreetTrailProposed trail crossingProposed Linkage
DataBiodiversity patternAnimalsPlantsInsectsOtherPublic Comment

Illustrative pattern, not a survey.

03

Analysis

Land use comment: This valley has been ranch land for three generations.Growth comment: Growth is coming either way. Plan it with us.Habitat comment: The wildlife corridor is what keeps this valley alive.Wildlife observation: Tortoise sign along the wash every spring.Corridor comment: A new road must not cut the corridor in two.Trail comment: Trails should reach the hills without the highway.Access comment: Services and housing near what is already here.Water comment: Water is the limit here, not the land.HabitatCorridorTrail gapGrowthSpeciesComments

Point at a feature to trace it · choose it to hold it

0.0miMovement corridor

Creosote Wash is the only continuous link between the four habitat blocks.

Chapter 4 · Figure 4.3
04

Community Context

Community profile

Who lives here, and how the valley is used.

Creosote Valley 2045 plans for 268,400 residents in 101,200 households. Understanding them means reading three sources together: the public record, what residents tell us when they register, and what participants have said. Each is kept to its own strength, and where a field has no verified figure the profile says so rather than filling it in.

268,400Residents
101,200Households
35.4Median age
+34%Growth by 2045
U.S. CensusOfficial sign-upCommunity inputProject baselineNot collected
Population268,400 residents

A valley of 101,200 households, projected to grow about 34 percent by 2045. Growth is expected to concentrate in the three areas that already have streets, water and services.

268,400ResidentsProject baseline
101,200HouseholdsProject baseline
2.65People per householdU.S. Census
35.4Median ageU.S. Census
+34%Growth by 2045Project baseline
32,000 acPlanning areaProject baseline

Households by district

Town Center18,400
Saddleback17,600
Cholla Heights16,200
Mesa View14,900
Opuntia Flats12,700
Primrose11,400
Outside the valley10,000

Population and household counts are the baseline every other figure in this profile is read against.

Public record

Population, age, households, income, work, language

Drawn from the Census, so it describes the whole valley rather than the people who happened to answer.

Official sign-up

3,184 registered · 1,306 shared demographics

What residents tell us when they register. The only source that can reach the fields the Census does not ask.

Community input

6,128 pieces of input

Surveys, map comments and polls. Rich on how people use the valley, honest only about those who took part.

05

Growth Strategy

34%

Projected growth by 2045

3,400

Growth acres directed

3

Growth areas

14,600

Habitat acres held

Growth pressure

The valley is expected to grow 34 percent by 2045.

That demand has to land somewhere. The plan directs it to the three locations that already have streets, water and services, and holds the valley edges out of the development framework.

Town Center & Main Street

Mixed use, smaller commercial spaces, and housing above.

Saddleback Road Corridor

Consolidated commercial frontage with safer crossings.

Cholla Heights Edge

Limited residential where it meets the habitat corridor.

Development capacity

2026 2045, demand met 2045, below demand

Housing units

units
2026
101,200
2045
135,600

Meets the 2045 demand of 135,600 units

Jobs

jobs
2026
84,300
2045
106,200

Meets the 2045 demand of 106,200 jobs

Park acres

acres
2026
6,200
2045
7,600

7% below the 2045 demand of 8,200 acres

Trail miles

miles
2026
286
2045
340

14% below the 2045 demand of 394 miles

Each track runs to the 2045 demand for that measure. Housing and jobs are met within the three growth areas, without expanding the planning boundary into intact habitat. Park acreage and trail mileage stay short of what the 2045 population needs, which Chapters 5 and 6 address. Figures are demonstration values.

Opportunities + Challenges

What the plan has to work with.

Each item leads with its takeaway, marked in the headline, with the evidence behind it underneath.

Opportunities

04

One corridor already does two jobs

Creosote Wash carries the valley's drainage and its only continuous habitat link, so protecting it serves both.

Growth can go where the infrastructure already is

The Town Center and Main Street can absorb substantial growth without new roads, water or sewer.

The corridor is fundable and within reach

Habitat restoration along the wash is grant eligible, and the corridor crosses few ownerships.

Two crossings, one fix

The wash crossing and the school crossing are the same problem seen from two directions, so one project answers both.

The plan can build on systems the valley already has.

Challenges

04

The trail network has 54 miles of gaps

Missing connections are concentrated at Creosote Wash and the Cholla Heights edge.

Saddleback Road splits the habitat corridor in two

Wildlife movement and vehicle crashes overlap at the same two points.

Park access is uneven across the valley

The southern districts sit outside a ten-minute walk of a park.

Housing costs are outrunning local wages

Rents and prices are rising faster than local wages, and the street network has gaps.

The gaps are specific, located and measurable.

06

Plan

118

Pages in the draft

9

Chapters

v4

Document version

Oct 1 – Nov 15

Open for comment

Draft plan overview

Draft Creosote Valley 2045 Area Plan, version 4.

118 pages across 9 chapters, published for public review on September 28, 2026. The central question is how the valley should grow while protecting the landscape that makes it unique.

This draft answers it by directing growth to three areas that already have infrastructure, and by treating habitat, washes and wildlife movement as systems the plan has to keep connected.

How the draft was built

Every recommendation traces to a documented condition, a stated community priority, or both. Where the two disagree, the plan says so.

Draft Plan ReviewOpen through November 15

The document, chapter by chapter

118 pages
01Vision & Context1–10
02Creosote Valley Today11–26
03Growth & Development27–44
04Biodiversity & Natural Systems45–60
05Connectivity61–76
06Open Space & Recreation77–90
07Community Character & Resilience91–102
08Preferred Framework103–110
09Implementation111–118

Key takeaways

4

habitat blocks

Habitat fragmentation

Existing development and the road network have divided the valley's habitat into four large blocks. Creosote Wash is the only continuous link between them, and Saddleback Road cuts it in two places.

2

critical crossings

Wildlife movement

Documented movement concentrates along the wash corridor and the northern slopes. Two crossings account for most of the recorded barrier effect, and both are addressed in the recommendations.

54

miles missing

Trail connectivity

286 miles of trail exist, built largely through subdivision approvals, with 54 miles of missing connections between segments. Creosote Wash and the Cholla Heights edge hold the two largest gaps.

3

growth areas

Growth capacity

The Town Center, the Saddleback Road corridor and the Cholla Heights edge can accommodate projected demand through 2045 without expanding the planning boundary into intact habitat.

6,200

acres of park

Park access

6,200 acres of public park land sit unevenly across the valley. Residents in the northern districts are within a ten-minute walk of a park; the southern districts are not.

1

priority crossing

Street safety

Reported near misses concentrate at the Middle School crossing on Saddleback Road. That location leads the safety program.

Plan Themes

Five things the plan is trying to do.

Growth, biodiversity and connectivity are the three systems the plan holds together. Every recommendation in the draft answers to one of these themes.

Grow

Guide development to locations that already have streets, water and services.

Connect

Link neighborhoods, schools, parks and trails for people moving through the valley.

Protect

Keep habitat, washes and wildlife movement areas connected and intact.

Explore

Expand access to parks, trails, open space and the desert around them.

Thrive

Build a resilient community where growth and natural systems support each other.

Review the draft plan

Comment on any page.

Selected draft plan pages — 12 of 118 — with 190 comments on record. Click anywhere on a page to place a numbered comment marker, or add a page comment without placing a marker. No account required.

Tortoise Review

Cover

Vision & Context · Draft page 1

Creosote Valley study area, drawn as a three-dimensional bird's-eye view of the terrain.

Public Review Draft · September 2026

Creosote Valley
2045

Area Plan

Growth • Biodiversity • Connectivity

Prepared by the Creosote Valley Planning Department. This is a fictional demonstration document, produced to illustrate how a public review draft is organized and reviewed.

Comment period · October 1, 2026 – November 15, 2026

Sample page 1 of 12 · Draft page 1 · pinch to zoom, swipe to turn the page, or turn on comment mode to leave one.

What the comments say

Themes and concerns drawn from every comment on this draft. A reading aid, not a finding.

Comments on page 1

1
1

Taylor Young

Connectivity

The plan should show trail ownership and who maintains each segment.

190 comments on this document · 118 pages

07

Project History

The program

Sep 2024 – Jun 2027

Where the project is, and where it goes next.

Six phases, from the first field season to adoption, with every engagement activity the project has run plotted against them. Everything left of the line has happened. Everything right of it is committed to, but not yet done.

Engagement activity
Discovery & existing conditionsSep 2024 – Mar 2025
Community visioningMar 2025 – Jun 2025
Alternatives & technical workJun 2025 – Mar 2026
Preferred frameworkMar 2026 – Sep 2026
Public reviewSep 2026 – Nov 2026
Adoption & hearingsNov 2026 – May 2027
202520262027Today
ActivityOpen houseWorkshopStakeholder meetingSurveyDraft planHearingSocial blast
Phase Complete Current Planned Not yet happened

The process, in numbers

September 2024 to today

38

Engagement events

Workshops, open houses, pop-ups, briefings and hearings.

9

Open houses & pop-ups

In person at the Community Center, and online.

34

Stakeholder meetings

Agencies, utilities, tribes and community groups.

62

Meeting minutes recorded

Published with the project record, unedited.

3

Draft plans issued

Draft 1, Draft 2 and the public review draft.

46

Social media blasts

Project announcements and explainers.

3

Comment periods

Each one summarised by question, in full.

5

Technical memoranda

Filed alongside the plan and open to read.

Counts cover the project to date. Meeting minutes and technical memoranda are published in full with the project record; nothing is summarised in their place.

How we got here

7 of 11 milestones complete

Discovery, visioning, draft.

  1. 2024
    Sep 16Complete

    Existing conditions initiated

    Baseline field work, habitat mapping and the first trail inventory.

  2. 2025
    Mar 11Complete

    Community visioning complete

    Three workshops and the guiding principles that frame the plan.

  3. Jun 24Complete

    First community survey released

    Responses gathered on growth, habitat and trail priorities.

  4. Oct 8Complete

    Open space & connectivity workshop

    Field session along Creosote Wash with map boards at Saddleback Trailhead.

  5. Dec 9Complete

    Community survey results released

    Results published by question, with every open response kept in full.

  6. 2026
    Mar 17Complete

    Growth alternatives released

    Three alternatives published for public comment.

  7. Jun 11Complete

    Preferred framework selected

    The balanced framework carries forward into the draft plan.

  8. Sep 28Current

    Draft Area Plan released

    Public review draft published. Comment on any page of the document.

  9. Nov 15Upcoming

    Public review period closes

    Every comment recorded against its page, place or question.

  10. 2027
    Feb 18Upcoming

    Planning Commission review

    Revised draft and the full participation record.

  11. May 6Upcoming

    Board adoption

    Final Creosote Valley 2045 Area Plan adopted.

Public review period

October 1 to November 15, 2026

Open to everyone. Everything received is published in the comment log, unedited.

5days remaining

Comments on the draft plan
738
Map comments
1,062
Survey responses
2,447
Poll votes
1,523

Past updates

5 published

What has just happened.

Sep 28, 2026

Public review draft released

The Draft Creosote Valley 2045 Area Plan is published for public review. Comment on any page of the document, mark the map, or take the community survey. The review period runs through November 15.

Creosote Valley Planning Department

Sep 24, 2026

Community workshop announced

A community workshop on the draft Area Plan is scheduled for October 15 at the Creosote Valley Community Center, with stations for the plan, the habitat map and the community survey.

Creosote Valley Planning Department

Aug 11, 2026

Preferred framework presented

The preferred framework was presented to the Planning Commission. It integrates the three growth areas with a connected habitat, open-space, trail and mobility network, and carries forward into the draft plan.

Creosote Valley Planning Department

08

Public Input

Participation at a glance

What people shared.

See what people shared during the public review period, and how that input is informing the plan.

Demonstration Data

3,184 people took part, leaving 6,128 pieces of input across the review.

Point at a figure to see what it counts

Cumulative participation across the project. These measures overlap — a resident who took the survey and also commented on the map is counted in both — so they do not add up to a single total.

Bars compare each figure against the largest shown.

Most often raised

Habitat & Connectivity

Participants most often raised the connection between Creosote Wash and the larger habitat areas around it, and asked how new development would affect wildlife movement across Saddleback Road.

684

comments on this theme

27% of every theme raised

What the draft does about it

Draft Recommendation B-01 is being reviewed to determine whether the proposed habitat corridor should be widened along the western edge of the Cholla Heights growth area.

Demonstration content only. Staff make planning decisions. Theme analysis is a reading aid, not a recommendation.

Participation Over Time

Cumulative participants, 2026.

372596104215182043248128623184FebMarAprMayJunJulAugSep
Cumulative participants, February to September 2026. The figures are the record; the curve is a reading aid.

The draft plan review period opened October 1. Figures shown are cumulative across the project.

Community Priorities

Where should future development be focused?

2,447 responses · single selection

  • Town Center & Main Street34%842
  • Saddleback Road corridor24%596
  • Within existing neighborhoods19%461
  • Cholla Heights edge16%388
  • No new development areas4%108
  • Not sure2%52

What Creosote Valley should prioritize

2,447 responses · multiple selections allowed

Map Feedback

Where people commented.

Every comment placed on the map, read on the same drawing the plan is prepared on. Choose a topic to narrow the list; the numbered marks on the sheet answer to it.

1,062 map comments
Sheet layers
Existing Conditions2045 GROWTH BOUNDARY12345678

Marks are sized by how much comment each place carries, and numbered against the list beside them. Concentration is a reading aid, not a statistically representative sample.

Places commented on8

The places holding the most comments during the review period.

Results in Detail

How the input breaks down.

The poll, the map comments, the survey and the draft plan, read side by side. Each figure carries its own total and its own note.

Demonstration Data
Poll result1,523votes

Which connection matters most to you?

One answer each. The poll stays open through the review period.

A fast signal, not a decision. It is read beside the survey, where the same priorities are tested in more detail.
Where the map comments came from1,062map comments

Comments by the district they were placed in.

Comments cluster in the districts where the trail network stops and where the habitat corridor is crossed. Town Center and Saddleback together account for nearly half of all map comments.
Document topics738comments

What people commented on in the draft plan.

Comments are recorded against the page they refer to, so a topic can be traced back to the exact location in the document.
Most commented pages118pages

The pages that drew the most comment.

Page 47Existing Habitat Network38
Page 31Future Growth Areas29
Page 111Implementation24
Each page is shown where it sits in the 118-page draft, so the three can be read against the document's own shape.

Selected Participant Comments

In their own words.

Six comments from the review, each one shown with the chapter and page of the draft it was made against. The spotlight turns on its own; choose any comment to hold it.

"The trail stops on both sides of Creosote Wash. A crossing there would link two neighborhoods to the middle school in under ten minutes."

Dana WhitfieldConnectivity · Connectivity · Page 63
01 / 06

Key Themes

What people talked about.

Comments and survey responses, grouped by the subject they address. Themes are a reading aid, not an adopted priority.

  • 684Habitat & Connectivity27% of themes
  • 612Trail & Street Connections24% of themes
  • 483Open Space & Access to Nature19% of themes
  • 431Growth & Housing Choices17% of themes
  • 329Community Character & Resilience13% of themes
2,539 comments across five themes. Each comment is filed under one theme, so the shares add to the whole.
09

Next Steps

Step 01 of 5

Public review closes

15 Nov 2026

Every comment received is published in the comment log, unedited.

Dates are indicative. Adoption follows Planning Commission review and any revisions the comments require.

The full record

Every comment, exactly as it was submitted.

Nothing above this point is a summary of the record, and nothing here is either. Read every comment in full, each one with the page of the draft it was made against.

Stay updated on this project

Follow this project from a Tortoise account.

A free account saves Creosote Valley 2045 to your dashboard, so you can find it again and catch up on what it publishes. Tortoise does not send update emails yet, and taking part never needs an account.

Creosote Valley 2045 is a fictional demonstration project. It is not associated with any real jurisdiction, agency or planning process.