Skip to content
All use cases

Plans & Studies

A multi-year plan needs one engagement record.

A comprehensive plan runs for two to three years through visioning, existing conditions, alternatives, the draft and adoption. Tortoise 40 keeps all of it in one project, instead of one folder per phase and a scramble at the end.

01The challenge

Why the record fragments

  1. 01

    A new tool for every phase

    Each phase gets its own survey, its own page and its own logins. Nothing carries forward, and no one can tell a resident what they were already asked.

  2. 02

    Comments detached from the document

    Draft review arrives as an inbox. Nobody can say which chapter, which page or which version a comment is about, so each one is matched by hand.

  3. 03

    The appendix is built in the last month

    The What We Heard appendix is assembled from files that no longer match each other, by someone who was not there when the input arrived.

02Where Tortoise helps

Four products, one record.

Each part of the platform does one job in the sequence, and the record stays in the same project throughout.

Tortoise Shell

Surveys, map activities, document review with page-level comments, dated updates and a results report, all filed under the one project.

Tortoise Discover

One public address for the whole plan. A resident who engaged in year one can find what happened in year three without asking for a link.

Tortoise Intelligence

Drafts themes, gaps and next actions from the evidence already collected, each with its source, for a planner to review and sign off.

Tortoise Studio

Report production and exhibits when the plan document has to look like a plan document.

03The workflow

The whole plan, in one record

Each phase opens, closes and files into the same project.

  1. 01

    Set the project once

    The phases, the study area, the documents and the map are set at the start. Everything added later belongs to the same record and the same link.

  2. 02

    Publish each phase as it opens

    Visioning, existing conditions, alternatives. Each phase gets its own questions and its own closing date, and each one is dated when it opens.

  3. 03

    Review the draft where it is written

    Draft chapters are published as documents and comments arrive on the page they are about, against the version they were made on.

  4. 04

    Keep the record live between phases

    Updates are dated on the same page, so the gap between the alternatives and the draft is not silence.

  5. 05

    Report from the record, not from memory

    Participation, themes and the comments that carry them are produced from the collected input and exported for the adoption packet.

04What it looks like

The same record, drawn.

A figure of the workflow above, labeled as an illustration rather than a screenshot.

Illustrative figureNot a screenshot
  1. Vision

    year one

  2. Conditions

    year one

  3. Alternatives

    year two

  4. Draft review

    year two

  5. Adoption

    year three

Illustrative: five phases of a comprehensive plan filed under one project record.

Next

Writing a plan now?

Bring the phase you are in and we will show you how it files into the record the adoption packet needs.